Architectural consultancy · Fee planning tool

Architect Fee Calculator

Estimate and tabulate the Category 1 minimum fee for Basic Services using the fee scale in the Architects (Scale of Minimum Fees) Rules 2010.

CATEGORY 1 · Exceptional character & complexity

Project inputs

Enter the agreed cost of works. The estimate updates automatically.

Priority: Individually-designed houses and Renovation works are listed first for quick access. All other Category 1 typologies remain available below. Typology wording follows the supplied Rules (Schedule, page 18).
Choose a direct cost input or estimate the cost from gross built-up floor area and an indicative construction rate.
RM
Use the cost of works basis described in Rule 4 of the supplied Rules, not land cost.
Optional. Enter the estimated budget for the interior design works separately from the overall construction cost. The calculator applies the 10% minimum fee to that budget and adds it to the Basic Services fee.
Important: This calculator applies the Category 1 Basic Services fee formula and optional interior design Supplementary Service fee reproduced from the supplied 2010 Rules. Confirm the applicable rules, building classification, appointment scope and cost basis before using this estimate professionally. Other Supplementary or Additional Services, reimbursables and taxes are not included.

Fee summary

Basic Services

Calculated using the applicable Category 1 cost band formula.

Estimated minimum basic fee
RM 0.00
Enter a valid cost of works.
Total estimated fees (Basic + selected supplementary)
—
Interior design supplementary fee
Not selected
Fee as % of cost
—
Monthly equivalent over 12 months*
—

Supplementary Services tabulation

Rule 24(3)
Supplementary serviceBasisFee amount (RM)
Interior design services10% of interior design cost of works—
Total supplementary fee selectedRM 0.00

Basic Services phase tabulation

Rule 27
Service phaseFee shareFee amount (RM)
Total100%RM 0.00
*Monthly equivalent is a planning reference only, not a payment schedule prescribed by the Rules.

Category 1 fee scale

Reference bands and base fees used by the calculator (RM).

Rule 23(1)(b)(i)
Cost bandCalculation formulaBase fee at lower threshold

Source: supplied PDF, Architects (Scale of Minimum Fees) Rules 2010, Rule 23(1)(b)(i), pages 11–12; payment phase allocation, Rule 27(1), page 16.